Where NYC offices are being built out
Interior build-outs permitted by the Department of Buildings in the 12 months to September 28, 2026, across the 1,277 large office, retail and industrial buildings Leasemark tracks. New interior work usually follows a lease, so this is a rough map of where tenants are moving in.
- Build-outs, 12 months
- 3,056
- In office buildings
- 2,947
- Buildings with a build-out
- 728 of 1,277
- Floors with work
- 4,704
NYC Department of Buildings permits
Neighborhoods ranked by build-outs, last 12 months
Interior build-outs first permitted in each neighborhood's tracked buildings, most first, with how many of those buildings had one. Each links to the neighborhood's own build-out section. Not ranked, with fewer than 5 large buildings tracked: Bay Ridge, Bed-Stuy, Crown Heights, Flatbush, Jackson Heights, Park Slope and Washington Heights.
By quarter and borough
3,043 build-outs in the last four quarters (the newest through September 28, 2026), against 2,986 in the four before.
Build-outs by quarter, all tracked buildings
| Borough | Build-outs | Buildings with one |
|---|---|---|
| Manhattan | 2,839 | 615 of 837 |
| Manhattan office | 2,802 | 600 of 799 |
| Brooklyn | 118 | 58 of 200 |
| Brooklyn office | 88 | 39 of 97 |
| Queens | 67 | 39 of 185 |
| Queens office | 46 | 24 of 61 |
| Bronx | 32 | 16 of 55 |
| Bronx office | 11 | 7 of 17 |
Most build-outs, last 12 months
Newest build-outs
Questions about NYC build-outs
Where are offices being built out in NYC?
In the 12 months to September 2026, the most interior build-outs among the large buildings Leasemark tracks were in Midtown (1,132 in 199 buildings), the Financial District (341 in 74 buildings) and Grand Central (270 in 48 buildings), together 57% of the city total. 2,947 of the 3,056 build-outs were in office buildings.
How many office build-outs were permitted in NYC in the last year?
The Department of Buildings issued first permits for 2,947 interior build-outs in 670 of the 974 large office buildings Leasemark tracks in the 12 months to September 28, 2026, with work permitted on 4,589 floors in all. Across all 1,277 tracked buildings (office, retail and industrial) the count is 3,056. Smaller buildings are not counted.
Which NYC buildings have the most build-outs?
One Penn Plaza, 250 West 34th Street (35), 383 Madison Avenue (28) and 277 Park Avenue (27) had the most interior build-outs first permitted in the 12 months. Large multi-tenant towers lead because every new tenant or floor renovation files its own work.
Is build-out activity in NYC going up or down?
Across the tracked buildings, 3,043 build-outs were first permitted in the last four quarters (the newest through September 28, 2026), against 2,986 in the four quarters before, about the same. Permits trail lease signings by a few months, so this is a lagging sign of leasing, not a forecast.
What counts as a build-out here?
Interior work filed with DOB NOW (general construction, mechanical, plumbing, sprinklers, standpipe, structural or boiler work) on the same floors of a building and first permitted within 120 days of each other counts as one build-out, dated by its first permit. Facade, sidewalk shed, scaffold and fence jobs never count. A permit is approval to do the work; it does not say who the work is for or whether it is finished.
Where does this data come from?
NYC Department of Buildings, DOB NOW: Build Approved Permits (NYC Open Data), pulled 2026-09-30 with permits issued through 2026-09-28, joined by tax lot to the 1,277 large commercial buildings on Leasemark (at least 100,000 square feet of commercial space in Manhattan, 50,000 elsewhere). Jobs filed in the older BIS system are not included. Costs are the estimates filed with the jobs.
Source: NYC Department of Buildings, DOB NOW: Build Approved Permits, pulled 2026-09-30 (permits issued through 2026-09-28). A build-out groups interior jobs on the same floors first permitted within 120 days of each other, dated by its first permit; renewals are not new work. Only the large buildings Leasemark tracks count (100,000 SF and up in Manhattan, 50,000 SF and up elsewhere), not every permit in the city. Costs are the estimates filed with the jobs. A permit does not say who the work is for.